Gold ₹15,288.77/g ▲ +0.39% Silver ₹234.87/g ▲ +0.35% Platinum ₹5,518.49/g ▼ -0.10% Palladium ₹4,020.74/g ▼ -0.59% Rhodium ₹26,192.30/g ▼ -2.43% Copper ₹1,255.12/kg ▲ +0.45% Aluminium ₹286.81/kg ▲ +0.60% Cobalt ₹3,563.08/kg ▼ -1.08% Gallium ₹22,982.64/kg ▲ +0.20% Indium ₹69,209.09/kg ▲ +0.20% Iron Ore ₹8.53/kg ▲ +0.20% Lead ₹166.28/kg ▲ +0.74% Lithium ₹1,726.31/kg ▲ +0.20% Molybdenum ₹8,102.69/kg ▲ +0.20% Nickel ₹1,410.57/kg ▲ +0.13% Neodymium ₹12,405.39/kg ▲ +0.20% Tin ₹4,552.16/kg ▲ +0.38% Tellurium ₹10,427.07/kg ▲ +0.32% Uranium ₹17,313.43/kg ▲ +0.20% Zinc ₹333.77/kg ▲ +0.15% Crude Oil (Brent) ₹10,153.75/bbl ▲ +0.27% Crude Oil (WTI) ₹9,814.97/bbl ▼ -0.08% Gasoline ₹335.74/gal ▲ +1.45% Natural Gas ₹278.61/MMBtu ▲ +0.01%
Showing India prices for Tellurium. See international rates →

First Solar and Tellurium Demand — September 17, 2026

₹10.43
per gram
+₹0.03 (+0.32%)
Today's Change (24h)
Updated: September 17, 2026

Quick Conversions

10 Gram
₹104.27
Popular buying size
1 Tola
₹121.62
≈ 11.66g · Indian standard
100 Gram
₹1,042.71
Bulk buying
1 Kilogram
₹10,427.07
Investment grade

As of September 17, 2026, Tellurium is trading at Ten Rupees per gram across India. The 10-gram rate stands at One Hundred and Four Rupees, and 100 grams costs One Thousand Forty Three Rupees.

Tellurium Reference Rate — 10-Day Trend

Tellurium Price (₹/g)
Period Open₹10.35
Period High₹10.43
Period Low₹10.35
Prev. Close₹10.39

All prices in ₹ per gram · daily rate, updated once per day

One Company, an Outsized Share of Global Demand

It's rare that a single manufacturer's growth plans genuinely move a whole element's supply-demand balance, but First Solar comes close. Its cadmium telluride (CdTe) thin-film solar panels held an estimated 59% of the thin-film solar market in 2024, and CdTe panels are reported to cover more than 30% of the US utility-scale solar market. Today's tellurium reference rate is ₹10.43 per gram on September 17, 2026 — the commodity First Solar's entire panel business depends on.

  • First Solar's technology: cadmium telluride (CdTe) thin-film solar cells
  • Thin-film market share: roughly 59% held by CdTe in 2024
  • US utility-scale solar: CdTe holds more than 30% of this segment

Tellurium Reference Rate vs Recent Periods (₹ per gram)

Yesterday
₹10.39
+₹0.03 (+0.32%)
1 Week Ago
₹10.36
+₹0.07 (+0.66%)
1 Month Ago
₹10.42
+₹0.00 (+0.04%)
1 Year Ago
₹6.58
+₹3.85 (+58.56%)

Tellurium is currently priced at Ten Rupees per gram. Compared to one year ago, the price has risen by Four Rupees (+58.56%).

Tellurium Reference Rate by Weight

Today's Tellurium rate is Ten Rupees per gram. At this rate, 10 grams of Tellurium costs One Hundred and Four Rupees.

Unit Weight Price (INR) Price in Words
1 Gram 1.0000 g ₹10.43 Ten Rupees
8 Grams 8.0000 g ₹83.42 Eighty Three Rupees
10 Grams 10.0000 g ₹104.27 One Hundred and Four Rupees
100 Grams 100.0000 g ₹1,042.71 One Thousand Forty Three Rupees
1 Kilogram 1,000.0000 g ₹10,427.07 Ten Thousand Four Hundred and Twenty Seven Rupees
1 Ounce (oz) 28.3495 g ₹295.60 Two Hundred and Ninety Six Rupees
1 Troy Ounce 31.1035 g ₹324.32 Three Hundred and Twenty Four Rupees
1 Metric Ton 1,000,000.0000 g ₹10,427,067.00 One Crore Four Lakh Twenty Seven Thousand Sixty Seven Rupees

Growth Running Into a Genuine Physical Limit

First Solar doesn't mine or produce tellurium — it buys refined tellurium and manufactures panels, which puts the company's growth ambitions directly at the mercy of an element that makes up an almost immeasurably small fraction of the Earth's crust. By multiple industry accounts, First Solar's continued gigawatt-scale expansion has run into real supply constraints tied specifically to tellurium scarcity, not to manufacturing capacity or panel demand.

Why this isn't a problem First Solar can simply engineer around

Tellurium is recovered exclusively as a byproduct of copper anode-slime processing — there's no tellurium mine to expand, no dedicated deposit to develop faster. First Solar's raw-material availability is genuinely tied to decisions made in the copper-refining industry, an industry with its own economics that have nothing to do with solar panel demand.

MetricFigure
CdTe share of thin-film solar market (2024)~59%
CdTe share of US utility-scale solarMore than 30%
Leading CdTe manufacturerFirst Solar

Tellurium Reference Rate — Last 10 Days

The most recent Tellurium price on record (2026-09-17) is Ten Rupees per gram. This is up by Less than One Rupees from the previous day's rate of ₹10.39.

Date Price (INR/g) Change
2026-09-17 ₹10.43 +0.03
2026-09-16 ₹10.39 +0.00
2026-09-15 ₹10.39 +0.01
2026-09-14 ₹10.37 +0.02
2026-09-13 ₹10.36 +0.00
2026-09-12 ₹10.36 +0.01
2026-09-11 ₹10.35 -0.01
2026-09-10 ₹10.36 +0.05
2026-09-09 ₹10.31 +0.04
2026-09-08 ₹10.27

What This Concentration Means for Tellurium's Price Story

When one company's manufacturing plans represent such a large share of an element's total demand, that company's own expansion timeline becomes one of the most important things to watch for anyone following the underlying commodity — a dynamic that's genuinely unusual among the metals this site tracks, most of which have far more diffuse demand across many buyers.

The comparison table and 10-day history above track tellurium's own price trend. For a longer view, the site's own tellurium price history page holds real recorded data by year and month.

First Solar and Tellurium — Common Questions

First Solar is the leading manufacturer of cadmium telluride (CdTe) thin-film solar panels, a real, established alternative to the far more common silicon-based panels. CdTe held 59% of the thin-film solar market in 2024 by most industry estimates, with First Solar anchoring that share through gigawatt-scale manufacturing.

Cadmium telluride panels are reported to hold more than 30% of the US utility-scale solar market — a meaningful share for a thin-film technology competing against dominant silicon-based panels.

Yes, by multiple industry accounts — First Solar's continued manufacturing expansion has run into real constraints tied to tellurium's scarcity, since the element makes up an extremely small fraction of the Earth's crust and is only recovered as a byproduct of copper refining.

First Solar is a panel manufacturer, not a tellurium producer — it sources tellurium from refiners who recover it from copper anode slimes. Its business is directly exposed to tellurium availability and price without controlling the upstream supply itself.

Today's reference rate of ₹10.43 per gram reflects the broader tellurium market, of which First Solar's CdTe demand is the largest single component — the two are closely linked without moving in perfect lockstep, since other buyers and copper-refining supply also factor in.